DHJ-Bimtek

Lervig Brygge

Location: Stavanger, Norway

Investor: Selvaag Bolig

Architects: Lund Hagem Arkitekter

Area: 30 300 m2

Project period: September 2013 – June 2014

Project phase: Project finalized

Services:

  1. Detailed Design Engineering (Design&Build):
    • HVAC
    • Heating and cooling
    • Plumbing and piping
    • Sprinklers systems
    • Electrical and weak current systems
  2. Coordinated 3D model:
    • BIM Level 2
    • LOD 500
    • Standard IFC2x3 cv 2.0 (MEP design)